Smart-avi PresenterWall Bedienungsanleitung Seite 27

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 48
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 26
27
Create a new Super Schedule
1. From the task manager select ‘Schedule’ / ‘New Super Schedule’.
2. Click “Add at the bottom left to create a Schedule. (Figure 7.4)
3. Create a name for your Schedule.
4. Set the duration of your schedule. (Note: Setting the duration to 00:00:00 sets the
duration to loop continuously.)
5. Select one of the Wall View Sets that you previously created.
6. Repeat steps 2-5 to create more schedules and sets to play consecutively. (Note: Be
sure to set durations to these schedules so that a schedule doesn’t loop
continuously.)
7. Once you have completed a schedule you can begin adding media files. Drag the
media file icons onto the screen representation. (Figure 7.5)
8. Once you drag an icon onto a screen, a Task Property window will appear similar to
Figure 5.3. Create this task as you would a task in section 5.
9. Repeat step 7-8 until you have the desired media in each set and schedule.
Figure 7.4
Figure 7.5
Seitenansicht 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 47 48

Kommentare zu diesen Handbüchern

Keine Kommentare